Product Details:
|
Type: | Steel Coil,Steel Plate,coil Or Sheet,Roof Sheet,roofing Sheet | Width: | 600mm-1250mm,30mm To 1250mm,100mm~2500mm |
---|---|---|---|
Technique: | Hot Rolled/cold Rolled/galvanized Surface Treatment,Hot Dipped | Grade: | SGCC,DX51D,SGCC/SGCH/SGHC/DX51D/CS-B,HDG,S355JR |
Standard: | DIN,ASTM,GB,JIS,AISI | Zinc Coating: | 30-600g/m2 |
Thickness: | 0.12-4.5mm | Product Name: | Galvanized Steel Coil |
Spangle: | Reuglar Spangle,Minimized,Big Medium Small Zero,or No Spangle,Normal | Surface Treatment: | Galvanized,Coated,dry,anti-finger,Oiled |
High Light: | 1.2mm 1.5mm Galvanized Steel Sheet,1mm 1.2mm Galvanized Steel Sheet,600g/M2 Galvanised Flat Plate |
Galvanized Steel Flat Sheet 1mm 1.2mm 1.5mm Hot Dip Galvanized Steel Plate
Product Description
The material of galvanized steel sheet can be galvanized on the surface of ordinary steel sheet, so there are many materials of galvanized steel sheet in a broad sense. Generally speaking, galvanized sheet in our market mainly refers to hot-dip galvanized thin steel strip, and DC51D+Z is the most widely used.
Product Details:
Normal spangle coating(NS),minimized spangle coating(MS),spangle-free(FS)
Product Parameter
Standard | astm a526 a528 a444, a653, jis g3302, en10142 en1012, etc |
Grade | DX51D+Z, DX52D+Z, DC52D+Z, DC51D+Z, S350GD+Z, G550, SGCC, DD52D+Z etc |
Thickness | 0.12-3.0mm (customize, above 3.0mm available) |
Width | 600-2000mm (customize) |
Length | as customer requirements |
Coil inner diameter | 508mm/610mm (customize) |
Zinc coating | 20-600g/m2 |
Raw material | cold rolled base. (hot rolled base also available) |
Technique | hot dipped. (electro also available) |
Coil weight | 3-8 tons |
Tolerance | thickness +- 0.02 or +- 0.04, width +-5mm |
Spangle type | zero spangle, small spangle, regular spangle, big spangle |
Surface treatment | chromated/non-chromated, oiled/non-oiled, anti-fingerprints |
Certification | CE, ISO9001-2008, SGS |
Monthly output | 17000 tons |
Packaging | 3 layers. kraft paper outside + water-proof plastic film in the middle + steel plate covered with strips outside |
Landing port | qingdao/shanghai/tianjin port |
Payment terms | T/T, L/C, western union paypal etc |
Delivery time | it takes about 10 days for stock goods, or it will need 15-25 days if goods need to be customized |
MOQ | as customer needs. reminder: more quantity reduce your purchase cost greatly |
Application
Roof, roof components, balcony panels, window sills, newspaper kiosks, warehouses and rolling shutters in the construction industry
Door heater, rainwater pipe, etc
Household appliance refrigerator, washing machine, switch cabinet, air conditioner, microwave oven, bread maker, copier, vending machine, electric fan, vacuum cleaner, etc
Furniture industry lampshade, wardrobe, table, bookshelf, counter, signboard, medical equipment, etc
Transportation industry: car ceiling, car shell, carriage board, tractor, tramcar, container
Expressway enclosure, ship bulkhead, etc
Other aspects: musical instrument shell, dustbin, billboard, clock, camera equipment, metering device
Applicable scope of equal galvanized sheet.
Packing and Transportation
Our advantages
Galvanizing steel production line with annual output of 2000000 tons, which adopts the most advanced American GBNB and Germany's Siemens electricalcontrol systems. it can produce ZERO zinc spangle, small-zinc spangle and common zinc spangle etc.Thickness from 0.125 mm to 4.5mm, and width from 500 mm to 1250 mm, and zinc coating from 40 - 275 g/m2, surface passivation and oil-coating can be performed. In addition, the company introduces a slitting machine, which can meet the customers' different requirements on the width.
FAQ
Q1:What is your terms of payment?
A: 30% T/T in advance, the balance 70% before delivery.
Q2: What is the terms of trade?
A: EXW, FOB, CIF, CFR, DDU.
Q3: What is the terms of packing?
A: Generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers'
requirement.
Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after received your deposit. For productiong period, it
usually takes about 15-30 days afer receiving the deposit.
Q5: Could you produce according to the samples?
A: Yes, we could customer-made by your samples or technique drawings, we could build the mold and fixtures.
Contact Person: Mr. Li
Tel: +8613256682860